Save 20% on all Cloud VPS plans — use code HAPPY20 at checkout
99.95% uptime SLA 24/7 support Since 2019 Tier IV · Noida · Mumbai
Client Area
GPU colocation · Tier IV · Noida · Mumbai IN-DEL · IN-BOM · quoted per rack

GPU colocation in India.
Your GPU servers, in a Tier IV datacenter.

Bring the GPU servers you own and run them in our cage in a Tier IV datacenter in Noida (Delhi NCR) or Mumbai: N+N UPS-backed power on 16, 32 or 63 A feeds, single or three phase, deep 600 × 1200 mm cabinets, URLStart’s DDoS-protected network and remote hands 24/7. From one 1U server to a full rack of training nodes, every option is quoted to your hardware and power draw.

✓ Tier IV · 2N✓ 16 / 32 / 63 A feeds✓ 600 × 1200 mm racks✓ Remote hands 24/7
42U cabinet · URLStart cagePowered · A+B
PDU APDU B TOR SWITCH · 10G TOR SWITCH · 10G PATCH · FIBRE CUSTOMER · 2U SERVER CUSTOMER · 2U SERVER CUSTOMER · 1U CUSTOMER · 1U CUSTOMER · 4U STORAGE BLANKING PANEL BLANKING PANEL CUSTOMER · 2U SERVER FREE U · GROW HERE FREE U FREE U CABLE MANAGEMENT · KVM UPLINK A · 10G UPLINK B · 10G METERED POWER10 KW+ PER RACK LOCKED DOOR · CCTV 42UYOUR HWROOM TO GROW REMOTE HANDS24/7 TIER IV · GREATER NOIDA · IN-DEL
Fig. 01 A URLStart cabinet: A and B power, top-of-rack switching and room to grow — schematic, not to scale
00At a glance

What is GPU colocation in India?

    TL;DR
  • GPU colocation means the GPU servers you own run in URLStart’s cage in a Tier IV datacenter in Noida (Delhi NCR) or Mumbai
  • Space from a single 1U, 2U or 4U server to a half rack (21U) or full rack, in 600 × 1200 mm cabinets up to 52U tall
  • N+N UPS-backed power through PDUs on 16, 32 or 63 A sockets, single or three phase; 10 kW per rack by default, more on request
  • Every option is quoted to your hardware and power draw; URLStart network, DDoS protection and remote hands included

GPU colocation in India with URLStart is rack space, power, cooling and network for GPU servers you already own, in our cage in a Tier IV datacenter in Noida (Delhi NCR) or Mumbai. GPU servers are deep, heavy and power-hungry, so the details that matter are the ones on this page: 600 × 1200 mm cabinets up to 52U, N+N UPS-backed power on 16, 32 or 63 A feeds, and an honest answer on how many kilowatts a rack can take. Choose Noida for users and teams in Delhi NCR and the north, Mumbai for Maharashtra, the west and traffic arriving on Mumbai’s undersea cables.

Facilities: Yotta D1, Greater Noida, and Yotta NM1, Navi Mumbai (operated by Yotta) · cage, network and hands: URLStart
Facility
Noida (Yotta D1) · Mumbai (Yotta NM1)
Classification
Tier IV · 2N
Cabinet
600 × 1200 mm · up to 52U
Power feeds
16 / 32 / 63 A · 1- or 3-phase
UPS
N+N · through PDUs
Density
10 kW/rack default · more on request
Network
1–10 Gbps+ · DDoS scrubbing
Pricing
Quoted to your power draw
01Rack options

GPU colocation options. Each one quoted to your hardware.

GPU power draw varies more than anything else in a rack, so we price it from your server list rather than a table. Pick the closest option and send us the model, count and power rating.

All options quoted · power metered · send your GPU server model and count for a quote the same day
1U
Space1 rack unit · single-GPU or inference node
PowerMetered · A+B feed
Network1 Gbps · burstable
Support24/7 remote hands
Quote Per server
2U
Space2 rack units · up to 4 GPUs typical
PowerMetered · A+B feed
Network1 Gbps · burstable
Support24/7 remote hands
Quote Per server
4U
Most requested
Space4 rack units · 4 to 8 GPUs typical
PowerMetered · dedicated circuit
Network1–10 Gbps
Support24/7 remote hands
Quote Per server
Half rack · 21U
Space21 rack units · locked
PowerMetered · dedicated PDU
Network1–10 Gbps
Support24/7 remote hands · managed
Quote Quoted to power draw
Full rack
Space42U, or up to 52U · 600 × 1200 mm
PowerMetered · dual PDU · 16/32/63 A
Network10 Gbps+ · cross-connects
Support24/7 remote hands · managed
Quote Training clusters
Free move-inTier IV fault toleranceN+N UPS powerMetered power billingRemote hands 24/7
02Power

How much power does a GPU server need?

Typical draw at full load from manufacturers’ published figures. Your exact number is on the server’s power supply rating and in its management interface; send us that and we size the circuit.

GPU serverHeightTypical draw at loadWhat fits
One-GPU inference node1U–2U0.5–1.5 kWSeveral per standard rack
Four-GPU server2U–4U2–4 kWTwo per default 10 kW rack
Eight-GPU server (HGX / DGX-class)6U–10U10–14 kW at maximum ratingOne per rack, with extra power on request
Storage and networking for a cluster1U–4U0.3–1 kW eachAlongside the GPU nodes
03Built for GPUs

What GPU servers need from a rack, and what you get.

GPU hardware is heavier, deeper and hotter than an ordinary server. These are the details we plan around.

Deep cabinets

600 × 1200 mm cabinets, up to 52U tall, take long GPU chassis with room for rear cabling and PDUs.

Space

Power on the right sockets

N+N UPS-backed power through PDUs, on 16, 32 or 63 A industrial sockets, single or three phase, matched to your power supplies.

Power

Power to match your hardware

10 kW per rack by default, and more when your GPUs need it. We size the circuit to your exact servers and check the cooling before they go in.

Density

Tier IV underneath

Fault-tolerant 2N power and cooling, so a failed feed or chiller never reaches a training run.

Facility

Network for data, not just pings

1 to 10 Gbps+ uplinks, cross-connects on request and DDoS scrubbing in the path, for moving datasets and serving models.

Network

Hands when a GPU fails

URLStart engineers with console and IPMI access reseat cards, swap disks and power-cycle nodes 24/7.

Support
04Getting a quote

How to get a GPU colocation quote.

Most quotes go out the same day.

01

Send your server list

GPU server model, quantity, height in U and power supply rating. A photo of the rating label is fine.

02

We size power and space

We work out the circuits, sockets and rack space, and tell you plainly if the density needs a high-density rack.

03

Move in

We plan the delivery, rack, cable and test the hardware with you, then cut over. Moving in is free.

06Specifications

Colocation specifications.

The datasheet, in one table. If a line matters to your workload and is not here, ask before you order.

ItemSpecification
Space1U / 2U, 21U half rack, 42U full rack (locked cabinet)
Cabinet600 mm × 1200 mm footprint, up to 52U tall — deep enough for long GPU and storage chassis
PowerMetered per kWh; dual PDUs; 10 kW per rack by default, more on request
Power deliveryN+N UPS-backed power through PDUs; 16 A, 32 A or 63 A industrial sockets, single or three phase
FacilityTier IV — fault-tolerant 2N power and cooling, generators and UPS
NetworkMulti-ISP, 1 Gbps to 10 Gbps+; cross-connects on request; DDoS scrubbing available
IPsIPv4 blocks and IPv6 from our space
Remote handsURLStart engineers 24/7 with console/IPMI; facility smart hands on request
SecurityAccess-controlled floor, CCTV, staffed security, locked cabinets on half and full racks
HardwareYours — any rack-mount server; we can help source compatible hardware
MigrationFree — from delivery to cut-over
ContractMonth to month; pay-as-you-grow
Uptime SLA99.95%
DatacenterNoida, Delhi NCR
07SLA & support

What uptime and support do you get? What you can hold us to.

The commitments behind the plan, stated once so there is no small print to find later.

99.95% uptime SLA

Measured monthly on network and power availability. Credits for breaches are defined in our Terms & Conditions — the SLA is a contract term, not a slogan.

Availability

Support 24/7, by engineers

Phone, WhatsApp, live chat and tickets from the client area — answered around the clock by people with console and IPMI access to the node.

Support

Monitoring and mitigation

Network and node monitoring at all hours; DDoS scrubbing in the path; emergency mitigation in under 30 seconds for customers under attack.

Operations

Snapshots and backups

Backups are your responsibility on dedicated and colocated hardware; we can add managed backup on request.

Data

Billing you can read

INR pricing, GST invoices with our UP GSTIN, UPI / cards / net banking / PayPal / crypto. Monthly or longer terms; cancel any time.

Billing

Refunds and cancellation

Cloud VPS, dedicated servers and add-ons are non-refundable except for faults on our side, per the Refund Policy. Cancel from the client area at least 7 days before renewal.

Policy
08Security & residency

Is your data secure, and does it stay in India?

Where your data physically is, who can touch it, and what stands between it and the internet.

Data stays in India

Every server is in one of our Tier IV datacenters in India, in Noida (Delhi NCR) or Mumbai. Nothing is replicated abroad unless you do it.

Residency

Physical security

Access-controlled floor, CCTV, staffed security and locked cabinets, operated by the facility; our cage inside it.

Facility

Isolation

Single-tenant hardware — nobody else on the machine.

Compute

DDoS scrubbing in the path

Volumetric, protocol and application-layer mitigation on ingress, included on every plan.

Network

Your keys, your access

Root or administrator is yours from minute one. We access a node only on your ticket, and IPMI sessions are logged.

Access

Fault-tolerant power and cooling

Tier IV 2N paths with UPS and generator backing — a single failure does not reach your server.

Facility
09Migration

How do you move to URLStart? Free, and done by us.

Tell us where you are hosted now. We do the rest.

01

Share access

Give our engineers access to the current server or a backup. We audit what runs there and plan the move.

02

We copy and test

Data, databases and configuration are moved to your new URLStart server and tested against the live site before anything changes.

03

Cut over

DNS is switched at a time you choose. The old server stays up until you confirm — no downtime window you did not agree to.

11Questions

Frequently asked.

Power, racks, cities and pricing.

01How much does GPU colocation in India cost?
Every option, from a single 1U server to a full rack, is quoted to your hardware and power draw, because GPU power varies so much. Send us the server model, quantity and power rating and most quotes go out the same day. Ordinary colocation starts at ₹5,999 a month for 1U/2U.
02Where are your GPU colocation racks?
In our Tier IV datacenters in Noida, Delhi NCR (Yotta D1) and Mumbai (Yotta NM1, Navi Mumbai). The racks, power and terms are the same in both cities.
03How much power can a GPU rack take?
Every rack comes with 10 kW by default, which fits two four-GPU servers. More power is available when your hardware needs it: an eight-GPU server is rated at 10 to 14 kW, and we size the circuit to your servers and check the cooling before they go in.
04What sockets and power do I get?
N+N UPS-backed power delivered through PDUs, on 16 A, 32 A or 63 A industrial sockets, single or three phase, matched to your servers’ power supplies. Power is metered, so you pay for what you draw.
05Will deep GPU servers fit?
Yes. Our cabinets have a 600 mm × 1200 mm footprint and go up to 52U, which takes long GPU chassis with room behind for cabling and PDUs.
06Do you offer liquid cooling?
No. Racks are air-cooled in a Tier IV hall with fault-tolerant 2N cooling. If your hardware needs liquid cooling, tell us and we will say plainly whether we can host it.
07Do you rent GPU servers?
No, this is colocation: you own the GPU servers and we host them. If you need a server rented by the month, see our dedicated servers.
BLOGRelated reading

Guides on this.

Written by the engineers who run the servers. All posts →

Cover: GPU server power at maximum rating, from a one-GPU node to an NVIDIA DGX B200, against the air-cooled rack limit

GPU colocation in India: power, cooling and cost before you rack your GPUs

Owning GPU servers is only half the job; they need racks that can power and cool them. What GPU colocation in India involves, how much power GPU…

Colocation · 24 Nov 2026 · 5 min read
Read→
Cover: a 42U cabinet drawing with patch panel, switch, firewall, database, application and storage units, for the colocation migration checklist

Moving your servers into colocation: a checklist for the move, step by step

A practical colocation migration checklist, from measuring power and choosing rack space to shipping, racking, IP addresses and the first week after…

Colocation · 25 Oct 2026 · 5 min read
Read→
Cover: ten questions to ask a colocation provider, grouped by building, power, network, access and leaving

Choosing a colocation facility in India: 10 questions to ask before you sign

Colocation hosting in India looks alike on paper. Ten questions to ask any colocation provider about the building, power, network, access and…

Colocation · 31 Oct 2026 · 4 min read
Read→

Ready to deploy?

Root shell in about a minute. Talk to an engineer first if you'd rather size it together.

✓ 99.95% uptime SLA ✓ Cards · UPI · Net banking · PayPal · Crypto ✓ Cancel anytime