Our datacenters.
One today. Tier IV, nothing less.
URLStart runs its cloud from a single Tier IV facility in Delhi NCR — our datacenter in Noida — with our own servers, storage and a 10 Gbps DDoS-protected network inside it. It serves Noida, Delhi, Ghaziabad and the rest of NCR at single-digit-millisecond latency. This page is the standard every URLStart datacenter has to meet, and the map of who it is nearest to.
One facility. Every NCR city within a few milliseconds.
The datacenter is in Noida. The city pages say what that means for you — distance, latency, and who deploys from there.
Noida
FacilityThe facility. Tier IV, 2N power and cooling, URLStart’s own servers, network and DDoS edge inside. Cloud VPS, dedicated and colocation.
Greater Noida
CityThe campus city: Knowledge Park, Ecotech and the industrial belt are on the same fibre as the cage.
Delhi
CityEnterprises, media and agencies with data residency in India and Tier IV power against city outages.
Ghaziabad
CityManufacturers on Tally, schools, local ISPs and resellers — ~30 km over NH-9.
Further out, still the nearest Tier IV.
City pages beyond the core of NCR. One facility, a peered national backbone, and a test IP you can ping before you buy.
Gurugram
NCRGurugram runs on SaaS, fintech and back-offices for global firms — and most of it is hosted in Mumbai or abroa…
Faridabad
NCRFaridabad is manufacturing, auto components and trading houses — businesses that run on Tally, ERP and a websi…
Meerut
NCRMeerut’s sports-goods makers, publishers, colleges and traders are an hour down the Delhi–Meerut Expressway fr…
Agra
CityAgra sits at the far end of the Yamuna Expressway — ~180 km from URLStart’s Tier IV datacenter in Greater Noid…
Lucknow
CityLucknow is the state capital and the fastest-growing IT and services market in Uttar Pradesh — and the nearest…
Kanpur
CityKanpur’s leather, textile and engineering industries run on ERP, Tally and dealer portals that should live in …
Jaipur
CityJaipur is one of India’s fastest-growing IT and startup cities, and most of its servers are in Mumbai or abroa…
Chandigarh
CityChandigarh, Mohali and Panchkula host IT parks, pharma and a dense professional-services market — most of it h…
Dehradun
CityDehradun’s universities, institutes, hospitals and a growing IT corridor need servers in India with a provider…
Mumbai
CityMumbai has more datacenters than any Indian city, so why would a Mumbai company host in Delhi NCR? For a secon…
Bengaluru
CityBengaluru teams usually host in Mumbai, Chennai or a hyperscaler region. A Delhi NCR site makes sense for one …
Where it is.
Noida sits at the south-eastern edge of NCR. Every city on the map is within an hour by road and a few milliseconds by fibre.
| From | To the datacenter | Typical route | Latency |
|---|---|---|---|
| Noida | ~25 km | Noida–Noida Expressway | single-digit ms |
| Delhi (Connaught Place) | ~40 km | DND Flyway → Expressway | single-digit ms |
| Ghaziabad | ~30 km | NH-9 / Eastern Peripheral | single-digit ms |
| Gurugram | ~60 km | Delhi–Mumbai Expressway / KMP | single-digit ms |
What every URLStart datacenter must have.
Six requirements. A facility that misses one is not on this page.
Tier IV facility
Fault-tolerant, concurrently maintainable power and cooling — 2N paths, so a single failure never reaches your server. Tier III is not enough for us.
Our own network
A URLStart-operated 10 Gbps core and redundant edges in every facility, with our IP space and our routing — not a carrier’s shared port.
DDoS scrubbing in the path
Volumetric, protocol and application-layer mitigation on the ingress of every facility, included on every plan.
Our hardware
AMD EPYC and Intel Xeon nodes, NVMe storage, dedicated servers and colocation cages that URLStart owns and maintains.
Our hands, 24/7
Remote hands with console and IPMI access by URLStart engineers, backed by the facility’s smart hands. The same team answers your ticket.
Physical security
Access-controlled floors, CCTV, staffed security and locked cabinets — operated by a facility partner that specialises in exactly that.
Why Tier IV is the line we hold.
Uptime Institute tiers describe what happens when a component fails or is maintained. Most Indian hosting sells Tier III as premium. We start above it.
| Tier | Design | Redundancy | Expected availability |
|---|---|---|---|
| Tier I | Basic capacity | None — planned and unplanned outages take the site down | 99.671% (~28.8 h/yr down) |
| Tier II | Redundant components | N+1 components, single distribution path | 99.741% (~22 h/yr) |
| Tier III | Concurrently maintainable | N+1, multiple paths, one active | 99.982% (~1.6 h/yr) |
| Tier IV — URLStart | Fault tolerant | 2N / 2N+1, multiple active paths | 99.995% (~26 min/yr) |
What comes next.
A second facility is added only when it meets the standard above. We announce it when it is live, not before.
Ask about a region
If your workload needs a second city, tell us which. Demand decides where the next cage goes.
Test the latency first
Ask for a test IP in Noida and measure from your office before you commit.
Read the facility page
Power, cooling, network, who runs what, and the case for a full rack.
One network design, wherever the racks are.
Facilities may differ; the network does not. Redundant URLStart edges with scrubbing, a 10 Gbps core, and no plan-by-plan tiering of who gets the good path.